Ports Energy and Carbon Savings | 2 Mers Seas Zeeën

PECS

Vous êtes ici

Ports Energy and Carbon Savings

Priority Axis

Low Carbon Technologies

Specific objective

Low Carbon Technologies

Lead partner

Autonoom Gemeentebedrijf Haven Oostende

Contact

Date de début

13/07/2017

Date de fin

20/06/2021

Project budget

8 070 649

ERDF amount

3 981 011

ERDF rate

49%

    À propos

    Common challenge

    One of the major challenges for the 2 Seas area is to achieve carbon reductions through introduction of low carbon technologies (incl. renewables and energy efficiency). This project is addressing this challenge; in particular the application of such technologies in maritime operations within small and medium sized (SMS-)ports. These ports face numerous common obstacles (f.e. limited resources, technical expertise, lack of collaboration, regulations) and as a result little has been done to reduce carbon emissions. Demonstrations of low carbon technologies and solutions in real life and different circumstances are required to raise awareness and to show feasibility. In addition to convince other SMS-ports it is also necessary to develop and showcase practical methods and tools as energy audit, potentials for renewables and the best mix of low carbon options. Finally SMS-ports needs practical models for low carbon investment & business cases and to come to energy cooperation structures.

    Main Achievements

    In this third year, due to COVID-19, PECS has made some, but not much progress in the achievement of outputs, communication (newsletters, social media, press releases, publications and presentations at events) and cross border cooperation.

    All partners have submitted claims and achieved a total spending € 6.8 mio (approx. 84% of total budget). The little underspending is mainly due to COVID-19 and delays in the realisation of three pilots (O13-IndaChlor, O11-Port of Ostend and O8-Hellevoetsluis). In the first and third case problems with permits are the main cause, but for O13 this has been solved and for O8 partly. In the second case there were problems with design and tendering, but these are solved now. So the project will spend the whole (or almost) budget by the end of the project in 2021.

    Although the project is behind schedule, most outputs are completed or almost completed. In WP1 (tools and methods), 4 of the 5 outputs are ready, and for the last one, O4, a draft version is ready. In WP2, one output (O6-overall verification study) has been completed and the second one (O7-overall testing and monitoring report) is half way and will be completed in March
    Also 6 out of 8 pilots are ready: Wind turbine in Ostend, Linkspan in Portsmouth, Floating Solar panels in Hellevoetsluis, LEM-Platform in OD IJmond The Small wind turbines in Hellevoetsluis and the Energy pontoon of BPS. The first 4 are also tested and monitored, the last 2 are now being tested. The 2 other pilots (O11 and O13) have some delays and will be completed in 2021 (at the latest in June).

    Regarding specific objectives and results good results can been reported for 3 pilots, only the Medium sized wind turbine has less results than expected. For the tools/methods which are ready we don’t yet know how much they are used by others. This will be investigated by a survey which will be executed in January-March 2021.

    Cross-border cooperation proceeds well. Knowledge partners have collaborated on development of methods and port partners contributed by testing’s. In the other way around, knowledge partners have supported pilot partners with their investments (monitoring). Collaboration is also good with regard to management and communication.

    Partnership

    Partners

    Gemeente Hellevoetsluis

    Omgevingsdienst IJmond

    HZ University of Applied Sciences

    CEREMA

    IndaChlor sasu

    Southampton Solent University

    Portsmouth City Council

    Universiteit Gent

    Blue Power Synergy

    Outputs

    Output title
    Type
    Target
    URL / Download
    30/09/2020

    PECS

    Thème: Low carbon technologiesPorts

    Testing and monitoring of implemented low carbon technologies

    Type: Feasibility study
    Target: Local, regional and national authorities
    30/09/2020

    PECS

    Thème: Low carbon technologiesPorts

    Investment in a turbine electricity producing system to make electricity from waste steam in the IndaChlor factory in the Port of Dunkirk

    Type: Pilot and demonstration action
    Target: Coastal zone management organisations
    31/08/2020

    PECS

    Thème: Low carbon technologiesPorts

    Energy cooperation structure for SMS-ports

    Type: Method/service
    Target: Local, regional and national authorities
    31/08/2020

    PECS

    Thème: Low carbon technologiesPorts

    Small scale investment in 5 small wind turbines in the municipal ports of Hellevoetsluis

    Type: Pilot and demonstration action
    Target: Coastal zone management organisations
    31/05/2020

    PECS

    Thème: Low carbon technologiesPorts

    Decision making tool to select the best mix of low carbon options

    Type: e-infrastructure/online tool
    Target: Coastal zone management organisations
    31/05/2020

    PECS

    Thème: Low carbon technologiesPorts

    Small scale investment in a prototype of energy production and storage pontoon

    Type: Pilot and demonstration action
    Target: Coastal zone management organisations
    31/12/2019

    PECS

    Thème: Low carbon technologiesPorts

    Small scale investment in smart pontoons in the port of Ostende

    Type: Pilot and demonstration action
    Target: Coastal zone management organisations
    30/09/2019

    PECS

    Thème: Low carbon technologiesPorts

    Investment in IT-systems and technologies for development of a LEM-platform that enables flexible renewable energy distribution in the port of IJmond

    Type: Pilot and demonstration action
    Target: Coastal zone management organisations
    30/06/2019

    PECS

    Thème: Low carbon technologiesPorts

    Small scale investment in an innovative medium sized wind turbine in the martime environment of the port of Ostende

    Type: Pilot and demonstration action
    Target: Coastal zone management organisations
    30/06/2019

    PECS

    Thème: Low carbon technologiesPorts

    Small scale investment in 100 solar panels in the Helius port of Hellevoetsluis

    Type: Pilot and demonstration action
    Target: Coastal zone management organisations
    31/05/2019

    PECS

    Thème: Low carbon technologiesPorts

    Overall independent verification studies of feasibility for the implementation of 9 different kind of low carbon technologies in ports

    Type: Feasibility study
    Target: Local, regional and national authorities
    31/12/2018

    PECS

    Thème: Low carbon technologiesPorts

    Method for energy audit in SMS-ports.

    Type: Method/service
    Target: Local, regional and national authorities
    31/12/2018

    PECS

    Thème: Low carbon technologiesPorts

    Method to assess potentials of renewable energy sources in SMS-ports

    Type: Method/service
    Target: Local, regional and national authorities
    31/12/2018

    PECS

    Thème: Low carbon technologiesPorts

    Method to identify energy saving options in SMS-ports

    Type: Method/service
    Target: Local, regional and national authorities
    30/01/2018

    PECS

    Thème: Low carbon technologiesPorts

    Investment in energy saving properties of a new linkspan at Portsmouth International Port

    Type: Pilot and demonstration action
    Target: Coastal zone management organisations